Completed NRA for Chile.
This document is an assessment of the risk of sourcing material from unacceptable sources in a given country, developed according to FSC-PRO-60-002 V3-0 EN The Development and Approval of FSC National Risk Assessments.
This risk assessment shall be used when implementing FSC-STD-40-005 V3-1 EN Requirements for Sourcing FSC Controlled Wood.
Please Note: Certificate holders have until 04 September 2020 to adapt their due diligence system to include the changes brought about by FSC-NRA-CL V1-0. The CNRA will remain available for download until that date.
++ Click here to submit a change request for this FSC risk assessment ++
FSC-NRA-CL V1-0 ES_2020-03-04.pdf
download
view