The first draft of the procedure was developed in collaboration with a technical working group and went through public consultation from late October 2021 to early January 2022.
Subsequently, the feedback from the first consultation was incorporated and the second draft was consulted between May and June 2022.
This Synopsis Report is based on the feedback received during the second round of public consultation and has been prepared in accordance with the current version of the procedure, FSC-PRO-01-001 V4-0.