FSC Connect website will be down for scheduled maintenance on Saturday, 20th July 2024, between 9:00 a.m. and 10:30 a.m. (CEST). We regret any inconvenience this may cause. | El sitio web FSC Connect estarƔ fuera de servicio por mantenimiento el sƔbado 20 de julio de 2024, entre las 9:00 a.m. y las 10:30 a.m. (CEST). Lamentamos las molestias que esto pueda causar.

This guidance is an analysis comparing the indicators specified in the V2-0 of the Risk Assessment Framework against those specified in the V1-0 and the requirements stablished in the EU Regulation on Deforestation-free Products (EUDR 2023/1115). The guidance shows how the indicators of the revised Risk Assessment Framework cover requirements specified under indicators of the previous version and the alignment with EUDR.

FSC-GUI-40-005 V1-0 EN Crosswalk of Indicators between Risk Assessment Framework V1-0 and V2-0.pdf

FSC-GUI-40-005 V1-0_ES_ComparaciĆ³n de indicadores entre el Marco para las Evaluaciones de Riesgos V1-0 y V2-0.pdf